nyc dot traffic standard drawings

View the most commonly issued. A separate Occupancy of Sidewalk Permit is required if a minimum of 5 feet cannot be maintained on the sidewalk for unobstructed pedestrian passage. See, Utilize recycled content in paving materials. THIS STIP IS USED FOR SINGLE CUTS IN THE CURB/PARKING LANE. serviceInformation on long-term capital programs from potential street excavators helps NYC DOT to effectively coordinate planned street work. These forms may also be found inAppendix B, Forms. 80-30 Park Lane WORK ALLOWED 8 AM TO 4 PM SATURDAY. There is one permit application form that covers Street Opening, Building Operations/Construction Activity, and Sidewalk Construction permits for non-governmental work. See the Highway Rules, Section 2-02(l). The form must be completed and faxed to EAU, which will confirm that the applicant's insurance is current. A scale of one to five $ symbols is used rather than specific monetary amounts because actual costs are subject to change. THIS EXECPTION DOES NOT APPLY IF STIPULATION 014 IS ALSO APPLIED TO THIS PERMIT. View the most recent version of Drawing #H1029 of the NYC DOT. YOU MUST SURVEY THE SITE. MAINTAIN 8 FOOT CLEAR PEDESTRIAN WALKWAY ON SIDEWALK. MUST MEET ALL REQUIREMENTS AS SET FORTH IN RTE 9A RECONSTRUCTION PROJECT REPAIR DETAILS FOR REPLACEMENT OF 50 YEARS CONCRETE PAVEMENT AND SIDEWALK DATED 9/7/2001. ALL OCCUPANCY OF THE ROADWAY SHALL BE CONFINED TO THE PARKING LANE ONLY, WITH NO IMPACT ON THE BIKE LANE OR TRAVEL LANES AT ANY TIME. THIS PERMIT ALLOWS FOR INSTALLATION OF TEMP ROADWAY/PAVEMENT MARKINGS AND/OR TEMP CONSTRUCTION REGULATORY SIGNS AS PER APPROVED MPT PLANS. Moreover, the Third Edition is available onlineto increase the reach and accessibility of this essential reference document. FULL WIDTH OF ROADWAY SHALL BE OPENED TO TRAFFIC WHEN SITE IS UNATTENDED. Office hours: Applications accepted, only from 8:00 AM to 11:30 AM; Upon satisfactory payment, the hold(s) will be released. Full Closure Review (FCR) hold An FCR hold is automatically placed on the 90th consecutive calendar day of any full street closure. MUST COORDINATE WITH RESIDENT ENGINEER NYSDOT MR.WONG AT 718-499-7075 PRIOR TO WORK. The following are laws, rules, regulations, and design guidance documents that may be relevant to the design of streets. 66 John Street, 10th Floor Queens Who has exhibited a pattern of disregard for the rules or orders of NYC DOT or the terms or conditions of permits issued by NYC DOT or for other applicable law. This Manual was created and published by the NYC Department of Transportation (NYC DOT) with contributions from a wide array of professionals from city government and the design field. LIGHTS MUST BE INSTALLED PRIOR TO 11/16 AND REMOVED BETWEEN 01/02 AND 01/15. CONTAINER SHALL NOT BE STORED OR PLACED WITHIN: (I) "NO STOPPING","NO PARKING ANYTIME" OR "AUTHORIZED PARKING" AREAS. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. The permittee must attach a copy of the original permit to the application when requesting a re-issuance and all applicable reviews and fees will apply. IF WORK IMPACTS ON THE BENCH, THE PERMITTEE MUST CONTACT NYC DOT AT 212-839-6569 OR VIA EMAIL AT, IF WORK IS AFFECTING A BIKE ROUTE/LANE, CONTRACTOR MUST POST ADVANCE WARNING SIGNS 350' & 200' PRIOR TO WORK ZONE "CONSTRUCTION IN BIKE LANE AHEAD PROCEED WITH CAUTION" AND ALSO POST SIGN AT WORK ZONE "CONSTRUCTION IN BIKE LANE,PROCEED WITH CAUTION". Worker's Compensation Insurance. Markets, public art, performances, and other events support a vital public realm, increasing pedestrian activity;supporting local businesses;connecting residents with resources;celebrating community, culture, and diversity;and encouraging local ownership of the public spaces in which they occur. Incorrect Information on File If a permittees 24/7 phone number, address or other contact information is inaccurate or has changed without being updated, all future permit requests may be placed on hold until the information is updated. WORK SATURDAY, 8 AM-6 PM AND SUNDAY 9 AM-6 PM. Most vault work also requires plan approval and a permit from DOB. SECTION 6: LEGAL ENTITY PERSONNEL: OFFICERS/ DIRECTORS/ MANAGING AGENTS/ OWNER/ PARTNERS /MEMBERS /INDIVIDUALS, ETC. Applicants should contact the NYC DOT Plan Examination Unit (PEU) of the Permit Office to initiate the application process and to determine specific requirements for a permit and a license, if required. This number should be kept confidential and only used to apply for NYC DOT permits. Manhole Embargo, Commercial Refuse Container, Temporary Plates and Shunts, Steam Tanks and Nitrogen Tanks permits are processed and stipulated directly by NYCSTREET. The minimum slope, calculated on a line perpendicular to the curb, must be 1" in 5', and the maximum is limited to 3" in 5'. THE PERMITTEE MUST HAVE APPROVAL FROM NYCDOT STREET LIGHTING FOR INSTALLATION/REPLACEMENT OF POLES. To release a POL hold, the Division of Traffic Operations, Office of Street Lighting must be contacted. PAVEMENT MUST BE RESTORED IN KIND. See Section 3.5.1 Holds for more information. (718) 391-1008 For further information, call (212) 839-9435. Prior to submitting a Street Opening Permit application, the Protected Streets Listing should be consulted in order to determine if the proposed work location is in protected status. The instructions below apply to corporations, partnerships, joint ventures and individuals. Applicants have two options to acquire an EAN. Attn: Forestry Inevitably, street excavations to install or access this infrastructure disrupt the normal activity of New York's streets, causing frustration and confusion for local residents and businesses. Permits In order to perform work in the street, it is necessary to obtain a permit from NYC DOT. Share long-term capital plans for planned repairs, upgrades and new 120-55 Queens Boulevard, Ground Floor, Room G-210 For complete NYC DOT requirements regarding the performance of work in the street, please consult the Highway Rules and NYC DOT specifications. FULL BUILDING LINE RESTORATION IS REQUIRED FOR WIDTH OF THE ROADWAY. Following are the steps for permit application, review and issuance at the borough Permit Offices: There are borough permit offices in Brooklyn, the Bronx, Queens and Staten Island. ALL UTILITY COMPANIES SHALL BE REQUIRED TO INSTALL THEIR UTILITIES &/OR CONDUITS A MINIMUM OF 18 INCHES BELOW THE ROAD WAY SURFACE OR BASE WHICHEVER IS GREATER AS PER NYC DOT HIGHWAY RULES & REGULATIONS 2-11(11)(VII). Other requirements may apply to the movement of cranes within city limits, such as daily or annual over-dimensional travel permit(s) as issued by NYC DOT. Your permit(s) must be reviewed and released by the OCMC Office. Failure to comply with an order issued by the Commissioner may result in criminal or civil penalties. NO WORK ON JULY 12, 2005. To request authorization for the installation of a canopy, an applicant must initiate the process at the HIQA office in the borough where the proposed canopy will be located. 144-06 94th Avenue, Main Floor The goal of advance coordination is to reduce the number of excavations in New York City streets. OCCUPY 15 FEET OF E/S CURB LANE. MeetingsRegular coordination meetings allow decision makers to share information and to discuss project difficulties and constraints. 1A. Customer Service: (212) 566-0042, Queens The NYCDOT Standard Details of Construction have been updated to include the revised H-1011 drawings covering pedestrian ramps. Based on the documents submitted, HIQA makes a preliminary determination as to whether the proposed location may be suitable for a canopy. Contact PEU for further information regarding the procedure to obtain initial and final approval for a transformer vault. This chapter describes the basic steps for performing work in the street, for restoring the street after work is performed, and for responding to each type of notice or request that may be issued during a Highway Inspection and Quality Assurance (HIQA) inspection. * Clear Path (pedestrian walkway): This directive is intended to provide pedestrians with the maximum amount of safety and space to traverse the sidewalk. APPROVAL FROM NYCDOT HIQA BOROUGH OFFICE IS REQUIRED BEFORE WORK COMMENCES. The Highway Rules, Section 2-07(c) (4) contains additional information. REQUEST TO DEP:LOCAL AND EMERGENCY TRAFFIC DURING WORKING HOURS DURING NON-WORKING HOURS ONE LANE OPENED TO TRAFFIC. WORK HOURS ARE 7 AM - 8 PM MON-FRI AND 9 AM - 6 PM SAT. 10 Richmond Terrace, Room 308 The second permit for canopy maintenance is automatically placed on a. 3. At the HIQA borough office, applicants will be given a Canopy Authorization Application (. Specific requirements for filling in abandoned vaults can be found in Section 2-13(o) of the Highway Rules. If there is no hold, the permit is issued to the applicant after appropriate payment is received. MAY WORK 7AM TO 8PM IN PARKING LANE ONLY TO OPEN UNDERGROUND STREET ACCESS COVERS FOR REPAIRS AND OR CABLE PULLS. Insurance and Permit Bonds After initial registration, active permittees must submit proof of all insurance and bonds annually. Long Island City, NY 11101 A NYCDEP BIOSWALE/STORMWATER GREENSTREET IS LOCATED ON THIS STREET. Listed in the table are the most commonly requested Sidewalk Construction Permit types, which may be used when completing an application. If the proposed work location is in protected street status, the application will automatically be placed on SAM hold for further review. PHONE#508-429-6023. These holds can only be released by OCMC executive staff. Non-Freeway, Special, WORK 11 PM TO 5 AM, MONDAY TO FRIDAY, MAINTAIN TWO 11 FOOT LANES FOR TRAFFIC, RESTORE FULL WIDTH WHEN SITE IS UNATTENDED. In this case, upon request of the permittee, NYC DOT will provide an opportunity to object to the permit revocation within five days after the request is received by NYC DOT. Connecticut Department of Transportation Division of Traffic Engineering Email: DOT.TrafficElectrical@ct.gov. SECTION24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. WORK ALSO ALLOWED 10 AM TO 6 PM SATURDAY. A statement that the canopy design and construction conforms to NYC DOT Standard Details of Construction. CPI holds are regularly released by the borough Administrative Superintendent of Highway Operations (ASHO) if the proposed work does not interfere with the in-house street resurfacing operation. AND SUN. The Bridge Hold Map shows locations where Bridge holds apply. Additional requirements are contained in Sections 2-02 and 2-09 of the Highway Rulesand should be consulted before any work is performed on the street. 10 Richmond Terrace, Room 427 CTDOT_Traffic_STD.zip The area of the sidewalk closest to the curb, where light poles, tree pits and other vegetation, signs, fire hydrants, and street furniture are typically located, is referred to as the furnishing zone.. Work Site Safety All obstructions on the street must be protected by barricades, fencing, railing with flags, lights, and/or signs placed at proper intervals and at prescribed hours in accordance with the most recent version of the Manual on Uniform Traffic Control Devices (MUTCD), published by the Federal Highway Administration, and the New York State Supplement. It provides both a thorough update to the guidance in previous iterations and a number of important additions: a new chapter on public programming in streets and public spaces; a host of new entries throughout the Process, Geometry, Furniture, and Landscape chapters; and substantially expanded coverage of several key topics, including bike lanes, inclusive design, and landscape selection and management. Check each borough in which the applicant expects to work. Keywords: Portable, Sign, Support, Temporary, Wooden, Keywords: Portable, Temporary, Rumble Strips, Keywords: Closure, Encroachment, Lane, Mowing,Shoulder, Special, 1150 Clove Rd. HOWEVER IT MUST BE PRESENTED FOR EXTENSION NO LATER THAN 5 BUS DAYS PRIOR TO EXPIRING. In order to assist the goal of advanced coordination, information about planned NYC DOT projects is available via theDOTMapportal within the NYCityMapwebsite. THE PERMITTEE MAY BE REQUIRED TO PAY STATION DEACTIVIATION AND/OR REMOVAL CHARGES. CRITERIA & PROTOTYPE FOUND AT: THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR CURB LANE ONLY RESTORATION AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. ALL WORK OPERATIONS MUST BE RESTRICTED WITHIN 11 FEET OF THE SOUTHEAST QUADRANT OF THE INTERSECTION. All other inquiries: (718) 222-7207 THIS STIP IS USED FOR MULTIPLE CUTS IN A CURB/PARKING LANE AND FOR SINGLE CUTS IN CURB LANES THAT CONVERT TO TRAVEL LANES DURING SPECIFIC HOURS. Only a canopy installer or authorized agent that is registered with NYC DOT can apply for a permit to install the canopy. With advance notice of NYC DOT's intent to work in a particular location, utility companies and other potential street excavators are better able to make arrangements to minimize potential conflicts or to leverage the opportunity to perform their work before resurfacing or reconstruction is complete. Jamaica, NY 11435 Tel: 212-720-3300 Interpreting Parking or Traffic Sign or Regulation Locate Parking Signs on Specific Streets Parking Sign Fact Sheet Parking in a School Zone Parking Rules School Bus Parking THE CONTRACTOR SHALL MAINTAIN (1) EITHER A 5-FOOT CLEAR SIDEWALK FOR PEDESTRIAN ACCESS AT ALL TIMES,(2) A PROTECTED WALKWAY IN THE ROADWAY MEETING ALL NYCDOT SPECIFICATIONS AND RAMPED AT ENTRY TO SIDEWALK FOR HANDICAPPED ACCESSIBILITY OR,(3) A NYCDOB APPROVED PROTECTED WALKWAY THORUGH THE BUILDING. WORK CROSSING THE ROADWAY CAN NOT EXTEND MORE THAN 11 FEET AT A TIME. MAY STORE TOOL CART IN PARKING LANE DURING NON-WORKING HOURS. THIS STIP IS USED FOR WORK IN AN INTERSECTION. Permits that have expired may be reissued only within30 daysof expiration. Standard Drawings are not currently available for download from the shaded states. The central Permit Office entrance is via Vietnam Memorial Plaza between Water and South Streets. (212) 839-9666 NYC DOT's concrete repair schedule for roadways, sidewalks and other assets in the street can also be accessed from this link. HIQA performs inspections during active construction. VARIANCE GRANTED TO WORK DURING SCHOOL HOURS AS STIPULATED BY O.C.M.C. RED LIGHT CAMERA CONDUIT IS LOCATED IN YOUR PROPOSED WORK AREA. A dismissal inspection is always required to close out a violation. Street excavators, including utility companies and developers, can access New York City Department of Transportation (NYC DOT) data and attend NYC DOT coordination meetings to facilitate effective communication regarding planned street work. WITH NYCDOT MILLING AND PAVING OPERATION. The protected streets layer is current as of the previous business day. It is essential to call New York 811 before digging anywhere, including sidewalks and soil. DOTMap also features a protected streets layer, enabling utilities and other potential street excavators to view which streets are protected and for what period of time. Other conditions may apply, such as a variation in the distance and width of the job, which may increase the fee required. 2 HOURS BEFORE UNTIL 2 HOURS AFTER ALL YANKEE HOME GAMES ALL MOVEMENTS INTO AND OUT OF THE SITE ARE RESTRICTED ALONG EXTERIOR STREET. WALKWAY IN CLOSED LANE. Payment by an applicant of outstanding fines, civil penalties or judgments imposed or entered against such applicant by a court or ECB; Payment by an applicant of outstanding fees or other charges lawfully assessed by NYC DOT against such applicant pursuant to the Highway Rules or other applicable law; and/or, Satisfactory compliance by an applicant with a CAR or order issued by the Commissioner. 75 Park Place, 9th Floor Workers pour cement during sidewalk reconstruction. LMZ (Lower Manhattan Zone) hold This hold signifies that you are working on a street that falls within the Lower Manhattan Zone (south of and including Canal Street). Ride the Staten Island Ferry. Check traffic advisories. SPECIFICATION. All street lighting designs must be approved by DOT Street Lighting Engineering Unit. SUCH SIGNS SHALL BE ORANGE,3'X3',DIAMOND SHAPE,WITH 4" BLACK LETTERING. THIS PERMIT REQUIRES REVIEW AND RELEASE FOR SPECIAL TRAFFIC PROJECT RESTORATION. (212) 442-7962 Further information is available in Section 2-02 (h) of the Highway Rules. Once the canopy installation permit application has been reviewed and approved by the Permit Office, the permit is issued to the canopy installer or authorized agent, and canopy installation can begin. Either response must be sent to NYC DOT's Division of Bridges at bridgeshold@dot.nyc.gov for review and release prior to commencing work. (718) 391-1937 DOB approval is also required. The applicant will also be notified of any corrective action necessary and recourses available. Corner TreatmentThe two slope lines meeting at the intersection of the two building lines must drop from a common point at the building corner toward their respective curbs at a rate within the limits prescribed in the Highway Rules.

Learn Biblical Aramaic, Cisco Ise Azure Ad Integration, How Long Has Greg Abbott Been Governor Of Texas, Glendale, Ca News Yesterday, Cotton States Golf Tournament, Articles N

nyc dot traffic standard drawings